Document packs·Waste register, BSD and construction site tracking

French construction waste register + Trackdéchets BSD: 2026 pack

Compliant waste-register spreadsheet + step-by-step Trackdéchets procedure (mandatory since 1 Sept 2026): 6 documents to pass the inspection instead of dreading it.

Preview of the first page: A-D04-01_02_PROCEDURE_BSD_TRACKDECHETS.pdf
Real preview49

Real preview: first page of “Procédure BSD Trackdéchets”, rendered from the delivered PDF.

Since the French decree of 25 March 2021, every construction business : from a solo tradesperson to an SME : must keep a chronological register of site waste, trace every hazardous waste with a BSD form, and sort 7 waste streams on site. On 1 September 2026, Trackdéchets becomes mandatory for all producers of hazardous waste: the paper form disappears. This pack contains 6 field-ready documents (regulatory state verified on 28/07/2026): a 4-sheet Excel site-waste register compliant with the order of 31/05/2021 (300 rows, dropdown lists of chapter-17 waste codes, automatic hazardous-waste detection, automatic yearly summary with recovery rate, full user notes); a step-by-step BSD / Trackdéchets procedure, 2026 edition (company account, BSDD forms, code signature, asbestos BSDA case, degraded mode, the 7 mistakes that cost dearly at inspection); a 10-clause waste-removal agreement; a 22-point referenced site-compliance checklist; a waste-reporting template accepted by project owners; and a 2026 regulatory memo with your 8 obligations, the 2026-2027 calendar and 21 ready-to-use waste codes. Triple format: editable DOCX (guided [Indiquer …] zones) + printable PDF + Markdown with an AI PERSONALIZATION block. Designed by an owner's-assistance practitioner who coordinated waste management for a 50,000 m³ deposit. Immediate delivery (ZIP, 21 files). Informational document : it does not replace individualized regulatory advice. Documents are written in French (they implement French regulations).

Who is it for?

Construction firms, site managers and QSE leads who must keep the waste register and issue BSDs on Trackdéchets.

Exact download contents

ZIP archive of 675 Ko · 21 files · 7 Markdown, 6 Word, 6 PDF, 1 Excel, 1 HTML

  • Registre déchets chantier
  • Procédure BSD Trackdéchets
  • Convention évacuation déchets
  • Check-list conformité chantier
  • Reporting déchets chantier
  • Mémo réglementaire déchets BTP 2026

What you get

  • 4-sheet Excel waste register compliant with the 31/05/2021 order: 300 rows, chapter-17 codes, automatic hazardous detection, yearly summary
  • Step-by-step BSD / Trackdéchets procedure, 2026 edition : 1 Sept 2026 switchover explained step by step (now in force)
  • 10-clause waste-removal agreement + 22-point site-compliance checklist (regulation and penalty referenced per point)
  • Waste-reporting template (monthly / end of site) + 2026 regulatory memo with 21 ready-to-use waste codes
  • Triple format: DOCX + PDF + Markdown with AI PERSONALIZATION block : 21-file ZIP
  • Designed by an owner's-assistance practitioner (coordinated a 50,000 m³ deposit) : regulatory state verified 28/07/2026
  • Informational content: does not replace individualized regulatory advice

Frequently asked questions

What changed on 1 September 2026?
The 2 t/year threshold disappears: every producer of hazardous waste, even for a single bag of aerosols or treated wood, must go through Trackdéchets : the paper BSDD form ends. The included procedure details the transition plan: company account, issuing a BSDD, code signature, degraded mode.
Does the Excel register guarantee I am compliant?
The register implements the columns set by the order of 31/05/2021 and automates hazardous-waste detection and the yearly summary. Final compliance depends on your actual practices (complete entries, 3-year retention, supporting documents): this pack is informational and does not replace individualized regulatory advice.
Do I need special skills to use it?
No. The register works with Excel, LibreOffice or Google Sheets (built-in dropdowns and formulas), the DOCX documents are filled through guided [Indiquer …] zones, and every Markdown version has a PERSONALIZATION block: paste it into Claude or ChatGPT with your details and the AI adapts the document to your business.
Can I withdraw after purchase?
No: digital content delivered immediately after payment. By ticking the consent box before buying, you request immediate performance and expressly waive your right of withdrawal (art. L221-28 of the French Consumer Code). Any issue: contact@chipiestudio.com.

See all questions →

In the same topic

All documents : Waste register, BSD and construction site tracking